left rhine railwayの例文
もっと例文: 1 2
- The station opened on 15 November 1855 of the Lower Left Rhine Railway.
- The station opened on 5 March 1863 on the Lower Left Rhine Railway.
- The line ended at Kleve station on the Lower Left Rhine Railway ( built by the RhE ).
- On 23 February 1881 this was renamed the " Royal directorate of left Rhine railways at Cologne " ( " K鰊igliche Eisenbahn-Direktion zu K鰈n linksrheinisch " ).
- The main station building is built on a platform between the tracks and it is located at the junction of the Lower Left Rhine Railway ( " Linksniederrheinische Strecke ", Cologne Kleve ) and the M鰊chengladbach D黶seldorf railway.